WEEK’s 9 & 10 December 4th-December 17th
High Country Construction completed framing the exterior walls, they installed the plywood sheathing and covered them with an air barrier wrap. They also completed the footers and piers for the columns for the front canopy and they saw cut the concrete floors as required.
Kozel steel installed the steel beams for the roof structure, they did not install the columns for the front canopy as they are waiting for the saddles for the tops that hold the wood beams in place.
We received the roof trusses and a forklift to set them in place.
High Country construction started to frame the flat roof at the connecting link and circulation counter.
Building Update
The Caledonia Library Association has started some of the steps in our first phase of our expansion: updating and renovating the existing building.
The first phase has a number of steps. They include asbestos removal, insulating the foundation under the back room, updating and adding to the outdated electrical system, re-pointing the stone walls, replacing the roof, replacing the back windows and updating the bathroom.
In order to do some of this work, we need to remove the floors in the back room and the children’s room. Doing this will allow us to complete a number of things at once. While we do this, we will have to stop our modified services for a short time. We will keep you posted via the internet and signs.
Asbestos removal: As part of the expansion project, the Library opted to have an asbestos assessment. We hired a company to come in and test the entire building. They were very thorough, and tested places we never would have thought of. They found that there was asbestos tape around the duct work seams, in the tape used to hide the drywall seams (the few there are), and in the sealant used to put the edge piece on the roof.
Because the amount of asbestos was small, air quality tests were only needed before and after abatement, not during. These tests showed safe levels, both before and after. As a public building, we thought it best to remove it completely. In order to remove the rest of the duct work, the floors need to come out of the back room and the children’s room. Before replacing the floors and carpet, we will insulate and rewire.
The electrical system: The increase in technology and electrical devices has put a burden on our wiring system. Two prong outlets have graduated to three prong outlets; outlets on the outer walls mean people have to run their computer cords across a high traffic area in order to power/charge their devices, making an unsafe condition; and multiple outlets in multiple rooms on the same breaker can overload the system and cause a power loss.
An updated and expanded electrical system will help meet the increase on our system from both staff and patrons. Outlets in the center of the room will eliminate the tripping hazard of cords in high traffic areas, while making it more convenient for patrons. An overhaul of the electrical system means the director won’t have to keep running to the cellar to reset the breaker. We want to be wired for the upcoming 22nd century!
Insulating the foundation: As part of the updating, the Caledonia Library Association is looking for ways to save energy and become more efficient. The back room has struggled to reach a high of 58 degrees during a cold period, and that is with the furnace constantly running. The cause of this is two-fold: no insulation and giant duct work. In order to become more energy efficient, we will be insulating the foundation under the back room and the children’s room, as well as installing smaller, more energy efficient, insulated ducts.
Re-pointing the stone walls: It’s obvious-the Library is made out of stones-BIG stones. What isn’t so obvious is the mortar used to join the stones is crumbling in the cellar. (The Library is almost 200 years old) We hired a mason to come in and re-point between these stones. We also hired this mason to fix the roof where the roof sealant was, as there was some exposure created from removing the sealant that had asbestos in it.
Re-pointing the library helps keep moisture and insects out, while maintaining the structural integrity of our beloved building.
Replacing the roof: Replacing the roof will allow us to use more up-to-date material that will offer better insulation and create a barrier against cold and heat while giving us proper ventilation. This not only saves energy, but the life of the roof, as well. In addition, it will give us access to the ceiling in order to add updated wiring for necessary lighting. The new roof will also merge with the roof line of the planned addition.
Replacing the back windows: The sills and mullions are dry-rotted due to exposure and old age.
Replacing the windows is absolutely necessary due to their condition, and aligns with our energy efficiency plan.
Updating the bathroom: Galvanized and cast-iron pipes installed in the late 1930s show severe rust and pose a potential water threat to the downstairs ceiling and bookshelves. Other fixtures, such as the toilet, pose the same threat due to their age and fail to meet current ADA requirements.
Updated pipes and fixtures reduce the threat of water damage. A new toilet will insure water efficiency and safety.
All of this work is the first phase of our expansion project. By updating and repairing the existing building, it will stand for another 200 years.
Board Meeting
Board Meeting
The link to tonight’s board meeting 3/28/23
Join Zoom Meeting
https://us06web.zoom.us/j/89374323073?pwd=RmdpdDZ1SGIrY3VVN3YrL2JiL3VCZz09
Meeting ID: 893 7432 3073
Passcode: 840077
One tap mobile
+16469313860,,89374323073#,,,,*840077# US
+16465588656,,89374323073#,,,,*840077# US (New York)
Dial by your location
+1 646 931 3860 US
+1 646 558 8656 US (New York)
+1 312 626 6799 US (Chicago)
+1 301 715 8592 US (Washington DC)
+1 305 224 1968 US
+1 309 205 3325 US
+1 719 359 4580 US
+1 720 707 2699 US (Denver)
+1 253 205 0468 US
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
+1 360 209 5623 US
+1 386 347 5053 US
+1 507 473 4847 US
+1 564 217 2000 US
+1 669 444 9171 US
+1 689 278 1000 US
Meeting ID: 893 7432 3073
Passcode: 840077
Find your local number: https://us06web.zoom.us/u/kdqwqYmyoY
Renate Goff, Director
Caledonia Library
3108 Main Street
Caledonia, NY 14423
Tel: 585-538-4512
Fax: 585-538-4978
Board meetings are the last Tuesday of the month at 6PM at the Library. Please come in through the back door.
The Annual Meeting is in May, and precedes the regular meeting.
Loosely Knit
Discover Your Family History
Search over 11 billion records spanning from the 1500s-2000s including census, immigration, military & vital records.
This version of the Ancestry product is available free of charge but only on site at the library. Library visitors can use their own internet-connected devices (laptops, tablets, etc.) at the library, or use library computers.
Follow us on Facebook!
Want to be one of the first to find out about new programs and library news? Make sure you’re following the library on Facebook!